Dashboard Assembly Ring A
PLC
--:--:--
—
Customer—
Part No.—
C.T.—
Shift—
—
--:--:--
Diff.
0 Pcs.
Actual − Plan
Production
Target(per shift)0Pcs.
Plan(real-time)0Pcs.
Actual(real-time)0Pcs.
Time & Defects
Operation time0Sec.
Stop time0Sec.
Rework / NG0 / –Pcs.
Operation ratio
Target 85% 0%
O.A.(Operation Availability)
Target 85% 0%
Loss time Green = within limit · Red = over limit · Dashed = limit
Status line
Production Set up Brake Stop Non production